Reconstruction of gas pipelines in Mary region

Workers of the gas and gasification department of Mary region of “Turkmengazupjunchilik” association carry out the construction of high pressure gas pipelines, reconstruction of existing gas pipelines, preparation of gas networks for the heating season and for uninterrupted supply of natural gas to the population of cities and villages.

To date, the reconstruction of the high-pressure gas pipeline with a length of 5317 meters has been completed on the territory of the etrap Takhtabazar of Mary velayat.  The mastered amount of construction and installation work amounted to 5 million 996 thousand manats.

Currently, the work of gas workers is concentrated on the territory of etrap Bayramali. There are high rates of work on the overhaul of the gas pipeline, starting from the gas distribution station "Tutly" to the settlements "Taze yol". Installation of pipes with a diameter of 530 mm is carried out by highly qualified specialists. At the same time, modern equipment, welding equipment and other technical units necessary for high-quality and timely performance of works are involved.

Related news

2014