Arrangement of gas pipelines in the Dashoguz region

In 2019, gas workers of the construction and installation department of the Dashoguz region of the “Turkmengazupjunchilik” association completed a number of effective measures, including gasification of the population, capital maintenance of gas pipelines, operation of networks and structures in the region.

To date, gas operators of the Department serve gas pipelines of various pressures with a total length of about 13 thousand km, as well as more than 4750 gas distribution and gas control equipment. The main activity of the Department is servicing the wiring of gas pipelines to industrial enterprises and construction sites, as well as performing the necessary repairs in full.

Such events contribute to the uninterrupted supply of "blue fuel" to consumers.  Extensive experience and high professionalism of our employees allow us to carry out the entire range of repairs, strictly observing the technical regulations. Thus, a significant amount of work was performed in the provinces of Ruhubelent, Kunyaurgench, Turkmenbashi, as well as in Dashoguz.

Currently, gas companies are developing and implementing a set of measures for the optimal development of the gas supply system, the introduction of technologies for accounting for gas consumption, etc.

Related news

2014