The «Marygazupjunchilik» department is preparing gas networks for the autumn-winter season

21:49 16.08.2021 4492

https://oilgas.gov.tm/storage/posts/2740/original-1611a0e5886e9f.jpeg

 Employees of the «Marygazupjunchilik» department have partially completed and continue to carry out a further set of important measures for uninterrupted and trouble-free gas supply in the autumn-winter period.

 At present, the specialists of the gas business enterprise «Murgapetrapgaz» are servicing high and medium pressure gas pipelines with a total length of 1152 km 391 m. A comprehensive survey of 93 gas distribution units and 551 gas control equipment is being carried out.

 The main task of the gas workers is to ensure trouble-free and uninterrupted gas delivery to the consumers of the etrap.  To avoid malfunctions and gas supply interruptions during cold weather, the company's specialists constantly monitor and repair gas networks and facilities on them.

 These days, builders and installers of the gasification department of the Mary region of the «Turkmengazupjunchilik» association carry out effective work to expand the volume of a high-pressure gas pipeline with a length of 3,300 meters, which will stretch to the village of Gengeshlik named after  G. Sakhetmyradov.  To date, construction and installation work has already been completed on the 1,410 meter section of the gas pipeline.

 In addition, a 2600-meter medium-pressure gas pipeline will be extended to the new settlements of Sugty gengeshlik, three gas control equipment have been built and put into operation.  For residents of the new populated areas of the gengeshlik named after Kh.Dzhumaev, a medium-pressure gas pipeline with a length of 1 km was laid, one gas control equipment was built and put into operation.

 On the territory of the etrap there are more than 32 thousand private households, 74 enterprises and institutions, which are uninterruptedly supplied with «blue fuel» throughout the year.

 The work performed by the gas workers will ensure the stable operation of the gas distribution system and increase the reliability of gas supply to consumers in the coming heating season.

Other articles
1660271d1b88f9.png
At exchange auctions, fuel and energy products were sold abroad and to the domestic market of Turkmenistan

At the auctions of the State Commodity and Raw Materials Exchange of Turkmenistan, 21 transactions were registered last week.


161f78079ab716.jpeg
Representatives of Turkmenistan and Pakistan to discuss TAPI projects and power lines in Islamabad

From January 30 to February 4, deputy minister of Foreign Affairs of Turkmenistan Vepa Khadzhiev was seconded to Islamabad, the capital of Pakistan, to conduct comprehensive negotiations on energy projects. The corresponding order was signed by President Gurbanguly Berdimuhamedov during the government meeting held on Friday.


1628c5e0b1af5c.jpeg
The products of the TCOR and the State Concern «Turkmengas» are in demand at the auction

54 transactions were registered at the auctions of the State Commodity and Raw Materials Exchange of Turkmenistan last week.


1648c08427dde3.jpg
Participants of the International Scientific Conference discussed the environmental aspects of the development of hydrocarbon fields

On June 15, the capital of Turkmenistan hosted the International Scientific Conference “Energy Prospects, New Technologies for the Development of Hydrocarbon Deposits”. The conference was organized by the State Concerns "Turkmengas" and "Turkmennebit", the State Corporation "Turkmengeology" in partnership with the ES "Turkmen Forum" and the British company Gaffney Cline.


160c85446b6fcd.jpeg
More than 1.8 million tons of "black gold" were shipped to TCOR in five months

The specialists of the main oil pipelines department have achieved good results in the delivery of "black gold" mined in the Balkan region to TCOR.