The «Marygazupjunchilik» department is preparing gas networks for the autumn-winter season

21:49 16.08.2021 4179

https://oilgas.gov.tm/storage/posts/2740/original-1611a0e5886e9f.jpeg

 Employees of the «Marygazupjunchilik» department have partially completed and continue to carry out a further set of important measures for uninterrupted and trouble-free gas supply in the autumn-winter period.

 At present, the specialists of the gas business enterprise «Murgapetrapgaz» are servicing high and medium pressure gas pipelines with a total length of 1152 km 391 m. A comprehensive survey of 93 gas distribution units and 551 gas control equipment is being carried out.

 The main task of the gas workers is to ensure trouble-free and uninterrupted gas delivery to the consumers of the etrap.  To avoid malfunctions and gas supply interruptions during cold weather, the company's specialists constantly monitor and repair gas networks and facilities on them.

 These days, builders and installers of the gasification department of the Mary region of the «Turkmengazupjunchilik» association carry out effective work to expand the volume of a high-pressure gas pipeline with a length of 3,300 meters, which will stretch to the village of Gengeshlik named after  G. Sakhetmyradov.  To date, construction and installation work has already been completed on the 1,410 meter section of the gas pipeline.

 In addition, a 2600-meter medium-pressure gas pipeline will be extended to the new settlements of Sugty gengeshlik, three gas control equipment have been built and put into operation.  For residents of the new populated areas of the gengeshlik named after Kh.Dzhumaev, a medium-pressure gas pipeline with a length of 1 km was laid, one gas control equipment was built and put into operation.

 On the territory of the etrap there are more than 32 thousand private households, 74 enterprises and institutions, which are uninterruptedly supplied with «blue fuel» throughout the year.

 The work performed by the gas workers will ensure the stable operation of the gas distribution system and increase the reliability of gas supply to consumers in the coming heating season.

Other articles
1651e729bc524f.jpg
The Minister of Economy of Azerbaijan Discusses Bilateral Cooperation Expansion Issues with the Leadership of the Fuel and Energy Complex of Turkmenistan

On Wednesday, the Government of Turkmenistan held negotiations on expanding the Turkmen-Azerbaijani cooperation in the oil and gas sector with the Minister of Economy of Azerbaijan Mikayil Jabbarov, who is visiting Ashgabat at the head of the Azerbaijani delegation.


161b320f67ce09.jpeg
Fuel and energy complex enterprises took part in the second virtual exhibition, which opened in honor of the Day of Neutrality of Turkmenistan

On the eve of the Day of Neutrality of Turkmenistan, the second virtual exhibition of the economic achievements of our country was opened on Thursday. The exhibition is organized by the Chamber of Commerce and Industry in partnership with ministries and departments, private enterprises of Turkmenistan.


161b82b22e7fab.jpeg
President of Turkmenistan congratulated workers of the oil and gas industry and geology on their professional holiday

Today, December 14, Turkmenistan celebrates the Day of Oil and Gas Industry and Geology Workers. On this occasion, President of Turkmenistan Gurbanguly Berdimuhamedov sent a congratulatory message to the workers of the oil and gas industry of our country.


161b8700bb3c32.jpeg
Presidents of Turkmenistan and Iran discussed by phone the development of cooperation in the fuel and energy complex, transport and other areas

During a telephone conversation, President of Turkmenistan Gurbanguly Berdimuhamedov and President of Iran Seyed Ebrahim Raisi discussed issues of developing cooperation in the fuel and energy complex, transport, agro-industrial complex and other spheres, the State News Agency of Turkmenistan reports.


161b056c2d58a3.jpeg
New technologies make work at gas stations more comfortable

Employees of the Gubadag Oil Enterprise of the Main Directorate of «Turkmennebitonumleri» for 11 months of this year have demonstrated effective results of their activities. After major reconstruction, a filling station No. 170 was put into operation, located in the eastern part of the Gubadag-Dashoguz highway.