The industry meeting summed up the results of the fuel and energy complex for January-February 2021

17:21 10.03.2021 3545

https://oilgas.gov.tm/storage/posts/1808/original-16047741563e59.jpeg

Today, in the Central Building of the oil and gas complex of Turkmenistan, a report meeting was held via video link under the chairmanship of Vice Chairman of the Cabinet of Ministers Shahym Abdrakhmanov, at which the results of the work of the industry enterprises for January-February 2021 were discussed, as well as important aspects of the implementation of the tasks set by the President of the country to the oil and gas complex at an expanded meeting of the Cabinet of Ministers held on March 5 this year.

Reports were made by the State Minister – Chairman of the State Concern "Turkmengaz" B. Amanov, Chairman of the State Corporation "Turkmennebit" G. Baigeldiev, Chairman of the State Corporation "Turkmengeologiya" M. Roziev, General Director of TCOR (Turkmenbashi complex of oil refineries) D. Chishiev, heads of the gas chemical complex in Kiyanli, as well as heads of departments and enterprises of the complex.

Turning to the consideration of the issues on the agenda, Vice Prime Minister Sh.Abdyrakhmanov noted that according to the instructions of the head of state, it is necessary to increase the volume of production of oil and gas resources with the use of modern technologies. It was also emphasized that it is necessary to strengthen the pace of introduction of digital technologies, comprehensive modernization of production facilities.

During the meeting, the issue of speeding up the construction of the Turkmenistan–Afghanistan–Pakistan–India gas pipeline and its delivery in due time was discussed.

At the end of the meeting, Vice Prime Minister Sh.Abdyrakhmanov wished the participants success in implementing the tasks set by the President for the oil and gas industry of our country in the year, which is held under the motto " Turkmenistan is the Birthplace of peace and trust»

Other articles
163e5fd1fbface.jpeg
New technologies at the oldest fields

In 2023, the Gumdag field, located in the western region of Turkmenistan, «celebrated» its 75-year milestone of industrial development. The first long-awaited oil inflow was obtained at well No. 1 in 1947.


163e5fd783bf04.jpeg
Pakistan is ready to implement the TAPI gas pipeline, - media

Pakistan has shown readiness to proceed with the Turkmenistan-Afghanistan-Pakistan-India (TAPI) gas pipeline project with or without India, as Afghanistan is ready to assemble special forces for this project. This was stated by Minister of State for Petroleum and Natural Resources Musadik Malik during his recent visit to Saudi Arabia, writes Business Recorder, a daily financial newspaper in Pakistan.


16073d5b16f79b.png
The amount of foreign exchange transactions at the auctions amounted to about $24 million

At the auction of the State Commodity and Raw Materials Exchange of Turkmenistan, 37 transactions were registered last week.


16073d45f198d6.jpeg
PETRONAS launched another oil production platform in the Turkmen sector of the Caspian Sea

Last Saturday, PETRONAS Carigali (Turkmenistan) Sdn Bhd launched the GDDP-A (Garagol Deniz Drilling Platform) oil drilling platform in the Turkmen sector of the Caspian Sea. The ceremony took place on the territory of the Marine Steel Assembly Shop in the village of Kiyanly on the Turkmen coast of the Caspian Sea.


161ce902dee151.jpeg
High frontiers of Korpeje gas workers

Specialists of the Korpeje Gas Production Directorate of the «Nebitgazchykarysh» Trust of the State Concern «Turkmennebit» achieved high results in the production of natural gas in the highly productive gas fields of Turkmenistan in the past year.