The subdivisions of the State Concern «Turkmennebit» are stepping up work to activate oil and gas wells repaired with plastic pipes.
Since the beginning of this year, as part of this work, 142 wells have been repaired and re-commissioned, which is 26 wells more than envisaged.
The use of wells that have stopped producing products is an important part of the work to increase the volume of hydrocarbon production at the oil fields of the concern.