Preparatory work for the autumn-winter period has begun

02:04 26.08.2020 9835

https://oilgas.gov.tm/storage/posts/389/original-15f2d19d0e4eb4.jpeg

Gas economical organization "Yolotenetrapgaz" of Mary region has started a set of organizational and technical measures, the implementation of which is aimed at ensuring reliable and safe operation of the gas facilities in the coming autumn-winter period.

In order to ensure uninterrupted and trouble-free gas supply to all consumers in the autumn-winter period, the enterprise is working on the reconstruction of gas supply systems, comprehensive instrumental inspection of gas pipelines, assessment of their technical condition, replacement of pipelines, etc.

In particular, specialists ensure the uninterrupted operation of gas pipelines of various pressures with a total length of 923 km, which run on the territory of the Yoloten etrap.​ On the territory of this etrap, specialists carry out maintenance of 29 gas distribution and 320 gas control equipment.

In Geneshliks Soltanbent, Enish, Yashlyk, by the beginning of the heating season, gas workers carried out a major overhaul of 2,182 meters of underground gas pipelines, replaced 487 meters of underground pipelines. Also, work was carried out to increase the diameter of the low-pressure gas pipeline with a length of 850 meters and its reconstruction. In the villages and towns of the etrap, modern powerful gas distribution and gas control equipment has been installed, which contributes to the uninterrupted supply of "blue fuel" to the residents of the etrap.

GEO "Yolotenetrapgaz" pays special attention to active promotion of safe use of gas in everyday life among the population.​ Employees are provided with all the necessary means, materials and special equipment, which makes it possible to predict with confidence that the repair and preparatory work planned on the gas networks will be carried out efficiently and on time.

Other articles
162d7b1837f9b2.jpeg
Tender for the construction of a tank farm on the territory of the Akhal gasoline plant was announced

A new tank farm for the storage of gasoline, sweetened diesel fraction and liquefied gas is planned to be built on the territory of the Akhal plant for the production of gasoline from natural gas in Turkmenistan. This is provided for by the international tender, which was announced by the State Concern "Turkmenchemistry", the newspaper "Neutral Turkmenistan" reports today.


167a458d116a98.jpg
President of Turkmenistan discusses development of interstate partnership with Special Adviser to Prime Minister of Japan

President of Turkmenistan Serdar Berdimuhamedov received Special Adviser to Prime Minister of Japan Akihisa Nagashima on February 5, TDH reports.


162d81c00a8e35.jpeg
Wide range of oil products was sold at exchange trading for export

At the auctions of the State Commodity and Raw Materials Exchange of Turkmenistan on Monday, July 18, 48 transactions were concluded for a total of $25.5 million and 32 million Turkmen manats, Orient reports.


167a4ad8f3339d.jpg
Representatives of the Central Asia + EU countries on Afghanistan are interested in implementing joint projects to restore the country

The participants of the sixth meeting of special representatives for Afghanistan in the Central Asia - European Union format, held in Dushanbe, expressed interest in close cooperation in implementing joint projects related to the restoration of Afghanistan. This was reported by the Ministry of Foreign Affairs of Turkmenistan.


167a45bb000224.jpg
Turkmenistan is ready to build partnership with Japanese companies in the gas sector, - Gurbanguly Berdimuhamedov

On February 5, the Chairman of the Halk Maslahaty of Turkmenistan Gurbanguly Berdimuhamedov held a meeting with the Special Adviser to the Prime Minister of Japan Akihisa Nagashima, during which they discussed issues of developing cooperation, including in the oil and gas sector, TDH reports.