Specialists of the Shatlyk enterprise ensure the stable operation of the main gas pipeline
20:05 01.04.2022 3646

The production enterprise «Shatlyk», located along the main gas pipeline Dovletabat – Deryalyk, is one of the leading production enterprises of the «Dashoguzgazakdyrysh» department. More than 300 specialists work here, who carry out technical control of the supply and pressure of natural gas to consumers.
The natural gas extracted from the Dovletabat and Galkynysh fields flows freely into the main gas pipeline. The length of high-pressure gas pipelines serviced by the Shatlyk production enterprise is 642 km. For uninterrupted supply of natural gas to consumers, planned measures for the repair, modernization and reconstruction of gas pipelines are consistently carried out.
So, recently, at 21-22 km of the second branch of the main gas pipeline, at a section of 420 meters, the company's specialists carried out repair work to eliminate damage to the external insulation of the gas pipeline. Currently, it is planned to replace pipes at 322 meters of the gas pipeline.
The specialists of the company's services also carry out constant and strict control over the accounting of pressure and volumes of natural gas supplied to consumers.
It should also be noted the activity of the electrochemical protection service of the enterprise. The work of protecting gas pipelines from corrosion is very important and the specialists of this service take their duties seriously. In accordance with the technical regulations, service employees conduct periodic inspections of gas pipelines, which in turn prevents corrosion of pipes and preserves their protective potential.

Aviation and automobile fuel was sold to foreign buyers at the auction
Last week, 20 transactions were registered at the auctions of the State Commodity and Raw Materials Exchange of Turkmenistan.

Turkmenistan's GDP growth for eight months remains at the level of 6.2%
The GDP growth of Turkmenistan for eight months of 2022 remains at the level of 6.2%. This was stated by President Serdar Berdimuhamedov at a government meeting held last Friday via digital system.

The results of the development of the fuel and energy complex for January-August 2022 were summed up at the government meeting
Last Friday, September 9, President Serdar Berdimuhamedov held a regular meeting of the Cabinet of Ministers on the digital system, during which the results of the work of all sectors of the national economy of Turkmenistan for eight months of 2022 were summed up. Vice-Chairman of the Cabinet of Ministers Shakhym Abdrakhmanov reported on the results of the oil and gas complex for January-August.

Investment projects in the fuel and energy complex and other areas were discussed by the heads of the Ministry of Foreign Affairs of Turkmenistan and the Saudi Development Fund
Issues of implementing investment projects in the energy sector, gas chemical industry, agriculture and water management, and healthcare were discussed at a meeting between Vice-Chairman, Minister of Foreign Affairs of Turkmenistan Rashid Meredov and CEO of the Saudi Development Fund Sultan bin Abdulrahman Al-Marshad. This was reported by the website of the Foreign Ministry of Turkmenistan.

The success of geophysicists is the result of innovation implementation
According to the results of seven months of this year, the amount of work performed on the management of «Turkmennebitgeophysics» of the State Concern «Turkmennebit» was more than 44 million manats. This result exceeds the planned figure for this period by 5.3 million manats.