Natural gas flow received at Sherepli field

10:20 04.08.2022 701

https://oilgas.gov.tm/storage/posts/5234/original-162ea1831ee448.jpeg

 On the territory of the Mary region, the gas workers of the «Turkmengazburawlayysh» department of the State Concern «Turkmengas», in accordance with the plan developed by the concern, carry out large-scale drilling of wells simultaneously at three new gas fields.  As a result of drilling operations carried out by geologists at the Sherepli gas field, a commercial flow of natural gas was obtained from the operational appraisal well No. 01.

 The design depth of the well is 2,600 meters.  Qualified gas workers of the department managed to get a powerful influx of "blue fuel" from a depth of 2330 meters.  Well-coordinated and productive work continued for six months.  According to experts, the daily flow rate of the well is 695,000 cubic meters of natural gas.  Such a primary production volume gives reason to hope for the prospects of this field.  The main characteristic feature of the production of the new field is the absence of hydrogen sulfide in the composition of natural gas.

 At present, drilling operations continue at an intensive pace at the new gas fields Kelleli and Yylan, located in the territory of the Mary velayat.  In the coming days, it is planned to start drilling an operational appraisal well No. 02 at the Sherepli gas field.

Other articles
15f3a1e0230338.jpeg
The results of the development of the fuel and energy complex for January-July of this year were discussed at a government meeting

Last Friday, President Gurbanguly Berdimuhamedov held a meeting of the Cabinet of Ministers via digital video communication, at which the results of the development for seven months of the year of all sectors of the national economy, including the fuel and energy complex of Turkmenistan, were discussed.


160b727d3025a2.jpeg
The head of Turkmenistan stated priorities of cooperation within the CIS

Changing world realities demand from the CIS a timely and adequate response, embedding in new coordinates of interaction. It was stated by the President Gurbanguly Berdimuhamedov in an interview to the International Television and Radio Company «Mir», answering a question about the prospects for Turkmenistan's cooperation within the Commonwealth.


1612c78db50090.png
Gasoline produced by TCOR is among the export transactions on the exchange of Turkmenistan

12 transactions were registered at the State Commodity and Raw Materials Exchange of Turkmenistan last week.


161f374d39b308.jpeg
In the Central building of the oil and gas complex of Turkmenistan a conference was held

On January 26, President Gurbanguly Berdimuhamedov held a working meeting with the participation of the leaders of the financial, economic and oil and gas complexes, at which the tasks for the further economic development of our independent state in 2022, as well as development issues in accordance with the realities of the time of the regions and improving the welfare of the people, were discussed.


15f3a7ca9482ff.jpeg
The industry meeting discussed the results of the fuel and energy complex for 7 months of 2020

Today, on August 17, in the Central building of the oil and gas complex of Turkmenistan, a reporting meeting was held under the chairmanship of Vice-Chairman of the Cabinet of Ministers Myratgeldi Meredov, at which the results of the work of industry enterprises for seven months of 2020, held under the motto "Turkmenistan - Homeland of Neutrality" were discussed.