International tender for the construction of the first solar-wind power plant in Turkmenistan was announced

20:29 21.06.2021 5269

https://oilgas.gov.tm/storage/posts/2414/original-160d03dab40e2e.jpeg

 An international tender for the construction of the country's first hybrid solar and wind power plant with a capacity of 10 MW in the Balkan region has been announced by the Ministry of Energy of Turkmenistan.  Proposals are accepted until August 6, 2021.

 It will be the country's first renewable power plant.  At a government meeting last Friday, President Gurbanguly Berdimuhamedov noted that this hybrid station would initiate work carried out in the country in the field of renewable energy sources, emp that the most advanced technologies and know-how would be installed there.

 According to the President, the implementation of this project would become a concrete practical step in the implementation of the National Strategy of Turkmenistan for the development of renewable energy.

 An agreement on the allocation of a loan for the construction of a hybrid solar-wind power plant with a capacity of 10 MW in the amount of US $25 million was signed with the Abu Dhabi Development Fund during a visit to the UAE on June 10, 2021 of a Turkmen delegation headed by Deputy Prime Minister, Chairman of the Supreme Control Chamber of Turkmenistan Serdar  Berdymukhamedov.

 At a government meeting last Friday, the President of Turkmenistan signed a decree according to which a loan was provided to the State Bank for Foreign Economic Affairs for 15 years with a grace period of 3 years at 4% per annum.  The same decree instructed the Ministry of Energy of the country to conclude an internal Credit Agreement with the State Bank for Foreign Economic Affairs for a period of up to 15 years with a grace period of 3 years at 4.5% per annum.

 In May 2019, Gurbanguly Berdimuhamedov launched the construction of a modern village in the Karakum desert near the artificial lake «Altyn Asyr».  Wind and solar installations will be used here to generate electricity.

Other articles
1651e729bc524f.jpg
The Minister of Economy of Azerbaijan Discusses Bilateral Cooperation Expansion Issues with the Leadership of the Fuel and Energy Complex of Turkmenistan

On Wednesday, the Government of Turkmenistan held negotiations on expanding the Turkmen-Azerbaijani cooperation in the oil and gas sector with the Minister of Economy of Azerbaijan Mikayil Jabbarov, who is visiting Ashgabat at the head of the Azerbaijani delegation.


161b320f67ce09.jpeg
Fuel and energy complex enterprises took part in the second virtual exhibition, which opened in honor of the Day of Neutrality of Turkmenistan

On the eve of the Day of Neutrality of Turkmenistan, the second virtual exhibition of the economic achievements of our country was opened on Thursday. The exhibition is organized by the Chamber of Commerce and Industry in partnership with ministries and departments, private enterprises of Turkmenistan.


161b82b22e7fab.jpeg
President of Turkmenistan congratulated workers of the oil and gas industry and geology on their professional holiday

Today, December 14, Turkmenistan celebrates the Day of Oil and Gas Industry and Geology Workers. On this occasion, President of Turkmenistan Gurbanguly Berdimuhamedov sent a congratulatory message to the workers of the oil and gas industry of our country.


161b8700bb3c32.jpeg
Presidents of Turkmenistan and Iran discussed by phone the development of cooperation in the fuel and energy complex, transport and other areas

During a telephone conversation, President of Turkmenistan Gurbanguly Berdimuhamedov and President of Iran Seyed Ebrahim Raisi discussed issues of developing cooperation in the fuel and energy complex, transport, agro-industrial complex and other spheres, the State News Agency of Turkmenistan reports.


161b056c2d58a3.jpeg
New technologies make work at gas stations more comfortable

Employees of the Gubadag Oil Enterprise of the Main Directorate of «Turkmennebitonumleri» for 11 months of this year have demonstrated effective results of their activities. After major reconstruction, a filling station No. 170 was put into operation, located in the eastern part of the Gubadag-Dashoguz highway.