Construction of gas pipelines in Mary region is underway
22:08 22.09.2021 5230

The builders and installers of the gasification department of the Mary region of the «Turkmengazupjunchilik» association carry out the construction of medium and high pressure gas pipelines at a high professional level in the cities and villages of this region. Over the seven months of this year, the builders have laid a gas pipeline with a length of 24,780 meters, a number of sections of the existing gas pipelines have been overhauled.
Recently, in the villages of the Murgap etrap, the specialists of the department, after repairs, put into operation a high-pressure gas pipeline with a length of 3,300 meters. The assimilated amount of work performed amounted to 9 million 728 thousand manats.
Timely logistics is critical to getting the tasks set done in the shortest possible time. In this direction, the “Marygazupjunchilik” department has a great responsibility to organize the supply of the necessary pipes and materials.

Official visit of the President of Turkmenistan to the UAE begins
On Monday, November 21, President of Turkmenistan Serdar Berdimuhamedov left for an official visit to the United Arab Emirates, TDH reports.

Turkmenistan and the UAE will create a joint bank to invest in projects in priority areas of cooperation
Turkmenistan and the United Arab Emirates are planning to create a joint bank with the opening of representative offices in both countries. This proposal was made at the meeting of President Serdar Berdimuhamedov with Vice-Chairman of the Cabinet of Ministers, Minister for Administration of the President of the United Arab Emirates Sheikh Mansour bin Zayed Al Nahyan, TDH reports.

The construction of new wells is being completed at the Galkynyş gas field
Vice-Chairman of the Cabinet of Ministers of Turkmenistan Shakhym Abdrakhmanov, during a government meeting last Friday, reported on the measures taken to complete the construction of wells at the Galkynyş gas field and produce additional volumes of natural gas.

Turkmenistan and the UAE intend to step up efforts in the areas of fuel and energy complex, chemical industry and renewable energy
Turkmenistan and the UAE intend to increase joint efforts in the oil and gas, oil refining, chemical industries and renewable energy. This is stated in the Joint Statement of Turkmenistan and the United Arab Emirates, signed on Monday following the talks of the President of Turkmenistan Serdar Berdimuhamedov with the President of the United Arab Emirates, Sheikh Mohammed bin Zayed Al Nahyan.

Pakistan will receive about 35 million cubic meters of gas per day through the TAPI gas pipeline
The plan for the construction of the Turkmenistan-Afghanistan-Pakistan-India (TAPI) gas pipeline has already been developed and can be implemented within 3-4 years. This was stated by the Minister of oil of Pakistan Musadik Malik, according to The Nation following the results of the Opinion Leaders Forum on the energy vision of Pakistan.