Production capabilities of RMP
10:05 26.08.2020 5904
The repair and mechanical plant of the Nebitgazburavlayish trust of the State Concern "Turkmennebit" is currently equipped with modern equipment and installations, which allow performing a wide range of works on the manufacture of spare parts, repair and restoration of equipment, their installation and adjustment.
Today this enterprise, established in 1951, is equipped with 150 types of equipment, which are constantly being improved. Here, new types of products are mastered, technologies are studied and introduced that make it possible to increase the wear resistance of manufactured spare parts, the production and technological base is continuously updated. The monthly amount of repair and mechanical work performed at the plant is 600,000 manats.
Currently, the plant specializes in the manufacture and repair of sliding girders, water heating boilers, rotors, mud pumps, hydraulic brakes, etc. The mechanical shop produces technical spare parts, various types of oil and gas equipment. The technical-production department produces hundreds of high quality rubber products, etc.
The presence of a professional staff and unique equipment allows us to manufacture the necessary parts and spare parts using materials (aluminum, rubber, cast iron, metal, etc.) obtained from various types of worn out equipment of the concern. This significantly reduces the amount of preparatory work, which makes it possible to save money and reduce material consumption.
The experience gained allows the plant's staff to carry out the most difficult tasks with high quality and on time.
The products of the TCOR and the State Concern «Turkmengas» are in demand at the auction
54 transactions were registered at the auctions of the State Commodity and Raw Materials Exchange of Turkmenistan last week.
More than 1.8 million tons of "black gold" were shipped to TCOR in five months
The specialists of the main oil pipelines department have achieved good results in the delivery of "black gold" mined in the Balkan region to TCOR.
TCOR exceeded the plan for the production of gasoline and liquefied gas in five months
In the five months of this year, which is held under the slogan "Turkmenistan - the Homeland of Peace and trust", the production of products in demand on the domestic and foreign markets has significantly increased at the Turkmenbashi complex of oil refineries.
Representatives of Turkmenistan and Pakistan to discuss TAPI projects and power lines in Islamabad
From January 30 to February 4, deputy minister of Foreign Affairs of Turkmenistan Vepa Khadzhiev was seconded to Islamabad, the capital of Pakistan, to conduct comprehensive negotiations on energy projects. The corresponding order was signed by President Gurbanguly Berdimuhamedov during the government meeting held on Friday.
At exchange auctions, fuel and energy products were sold abroad and to the domestic market of Turkmenistan
At the auctions of the State Commodity and Raw Materials Exchange of Turkmenistan, 21 transactions were registered last week.