LUKOIL starts the second stage of drilling at the second stage of the Filanovskoye field

10:37 14.10.2020 8064

https://oilgas.gov.tm/storage/posts/884/original-15f85929bae3e5.jpeg

“LUKOIL” has started the second stage of development drilling at the second stage of the Vladimir Filanovsky field in the Caspian Sea, INTERFAX.RU reports.

The second stage is aimed at maintaining the design level of production of 6 million tons of oil per year. Within the second stage, it is planned to build two wells and one sidetrack on an ice-resistant stationary platform (LSP-2). "This will help maintain the design level of oil production at the field," the press service of “LUKOIL” explains.

The company notes that for the construction of all facilities of the first, second and third stages, Russian contractors were involved - shipyards of the Astrakhan region.

The Filanovsky field is the largest oil field in the Russian sector of the Caspian Sea with initial recoverable reserves of 129 million tons of oil and 30 billion cubic meters of gas. Commissioned in autumn 2016. Thanks to the launch of the third stage of construction at the Filanovsky field, “LUKOIL”'s oil production in the Caspian in 2019 increased by 5.2% and amounted to 6.4 million tons.

As previously reported, in September 2020, the head of LUKOIL, Vagit Alekperov, at a meeting with President Gurbanguly Berdimuhamedov, briefed the head of our state with the development of oil and gas fields in the Caspian and noted the company's interest in cooperation with Turkmenistan both in the mining sector and in the production of finished oil products - and gas chemical industries.

Other articles
16488364149fdf.jpg
800 delegates from 20 countries of the world will take part in the scientific forum on environmental aspects of the development of the fuel and energy complex

The International Scientific and Practical Conference: «Energy Prospects, New Technologies for the Development of Hydrocarbon Deposits» in the Year «The Happy Youth with Arkadag Serdarly» will be held at the Yagshygeldi Kakayev International Oil and Gas University on June 15.


168403f004305e.png
Pre-conference day of the TESC 2025 forum

On Thursday, June 5, the International Scientific and Practical Conference "Environmental Aspects of Implementation of Innovative Technologies in the Development of Hydrocarbon Deposits" (TESC) will open in Ashgabat. The forum is organized by the State Concerns "Turkmengas", "Turkmennebit", the State Corporation "Turkmengeology" together with the "Turkmen Energy Forum".


166d4174a9c606.jpg
Turkish company to build new gas compressor station in Turkmenistan

The President of Turkmenistan signed a Resolution authorizing the State Concern "Turkmengas" to enter into a contract with Çalik Enerji Sanayi ve Ticaret A.Ş. (Republic of Turkey) for the design, construction and equipping of the Shatlyk-1 gas compressor station in Mary velayat with the necessary equipment and commissioning, TDH reports.


164873bf7c915c.jpg
The results of the work of the oil and gas complex of Turkmenistan for five months were summed up at the industry meeting

On Monday, June 12, a reporting meeting was held in the Central building of the oil and gas complex of Turkmenistan, at which the results of the work of enterprises in the industry for five months of this year, held under the motto “The Year of Happy Youth with Arkadag Serdarly”, were discussed.


161fb92e66f2cf.jpeg
Gurbanguly Berdimuhamedov: one of the priorities of cooperation between Turkmenistan and China is the fuel and energy sector

One of the priorities of cooperation between Turkmenistan and the People's Republic of China is the fuel and energy sector. This was stated by President of Turkmenistan Gurbanguly Berdimuhamedov in an interview with Chinese media before his trip to China to participate in the opening of the 2022 Winter Olympic Games in Beijing.