Nine-month fuel and energy sector performance summarized at government meeting

15:29 07.10.2025 1417

https://oilgas.gov.tm/storage/posts/15213/original-168e0f2475db45.jpg

On October 3, the President of Turkmenistan Serdar Berdimuhamedov held a digital meeting of the Cabinet of Ministers to summarize the country's work for the first nine months of this year, TDH reports.

During the meeting, Vice-Chairman of the Cabinet of Ministers Batyr Amanov reported on the work accomplished from January to September of this year to increase oil and gas production and expand supply routes to global markets.

As reported, the State Concern “Turkmennebit” fulfilled its oil production plan by 109.7 percent.

Oil refineries fulfilled their oil refining plan by 109.4 percent for the first nine months of this year.

During the reporting period, the gasoline production plan was fulfilled at 108.8 percent, diesel fuel at 101 percent, lubricants at 100 percent, and natural and associated gas production at 103.1 percent.

Furthermore, the report reported on the technical and economic performance of polypropylene and liquefied gas production, as well as natural gas exports.

Summarizing the report, President Serdar Berdimuhamedov noted the importance of effectively utilizing the production capacity of oil and gas enterprises. Emphasizing the need to discover new hydrocarbon deposits through the introduction of modern technologies and the continuous improvement of oil and natural gas refining operations, the head of state addressed the Vice-Chairman with relevant instructions.

Other articles
161c52c5b3a30e.jpeg
Turkmenistan exported natural gas worth $ 6.1 billion to China in January-November

Turkmenistan continues to hold a leading position in pipeline export of «blue» fuel to China. According to the General Customs Administration of the PRC, during January-November 2021, the Celestial Empire received 21.91 million tons of Turkmen natural gas through the Turkmenistan-China pipeline, which is $ 6.1 billion in monetary terms.


1663b25c032a85.jpg
With the participation of President Serdar Berdimuhamedov, the second stage of the Baherden cement plant was put into operation

Today, May 8, President Serdar Berdimuhamedov took part in the commissioning ceremony of the second stage of the Baharden cement plant with a capacity of 1 million tons of cement per year, TDH reports.


1663b45c3058f4.jpg
The head of Turkmenistan took part in the opening of the Yashlyk water treatment plant

Today, May 8, President Serdar Berdimuhamedov took part in the commissioning ceremony of the Yashlyk water treatment plant with a capacity of 30 thousand cubic meters of water per day, located in the Ak Bugday etrap of Ahal region, TDH reports.


167bd948383d75.jpg
Petronas is the leading partner of the International Forum TEIF 2025

The next strategic step to expand the investment potential of our country will be the International Forum on Attracting Foreign Investments into the Economy of Turkmenistan (TEIF 2025), which will be held on April 23-24, 2025 in Kuala Lumpur, Malaysia.


161c5d0693368a.jpeg
The volume of purchases of Turkmen gas by Gazprom will double in 2021, - Russian Ambassador to Turkmenistan

In 2021, the volume of gas purchased by Gazprom from Turkmenistan is likely to double and amount to about 10 billion cubic meters. This was stated on Friday by the Russian Ambassador to Turkmenistan Alexander Blokhin at a press conference at the embassy dedicated to the annual results of the Turkmen-Russian cooperation.