Natural gas – for farmers of Mary region

20:14 10.03.2021 7098

https://oilgas.gov.tm/storage/posts/1812/original-1604872d1ecdb7.jpeg

 In the Mary region of Turkmenistan, active work on the gasification of rural settlements is being carried out.  Since the beginning of 2021, a gas pipeline with a length of 4074 meters of high and medium pressure has been built by the gas workers of the construction and installation department for gasification of the population of the Mary region of the «Turkmengazupjunchilik» association.

 In addition, work is underway to reconstruct and install existing gas pipelines.  In these works, polyethylene pipes are used, which are distinguished by high density and withstand high pressure.  These products of the open joint stock company «Turkmenturba» are steadily supplied to the management of «Marygazupjunchilik».

 To date, the work on the reconstruction of the medium-pressure gas pipeline in the Gyzylgum farmstead association of the Sakarchagy etrap has been completed in time.  In the village of Khasyl, the Yenish farmstead of the Turkmengala etrap, a major overhaul of the medium-pressure gas supply pipeline was carried out.

 At present, the construction of a high-pressure gas pipeline on the territory of the Garashsyzlyk farmstead association of the Vekilbazar etrap is at the final stage.  The diameter of the pipes installed here is 315 mm, the length of the gas pipeline is 2000 meters.  At the construction site, modern construction equipment is involved, experienced builders and gas workers are involved in construction work, who perform the work efficiently and on time.

Other articles
16461c980884d6.jpg
Ashirguly Begliev appointed Advisor to the President of Turkmenistan on oil and gas issues

Ashirguly Begliev has been appointed Advisor to the President of Turkmenistan on oil and gas issues.


161e7f3511dc1d.jpeg
Demand for oil in 2022 will grow by 3.3 million barrels per day, the market will be in short supply – IEA

Demand for oil in 2021 increased by 5.5 million barrels per day, and in 2022 it will increase by 3.3 million bpd, Interfax and Bloomberg report citing a report by the International Energy Agency (IEA).


16461c8a93ac33.jpg
New Vice-Chairman for Fuel and Energy Complex of Turkmenistan appointed

Amanov Batyr Amangeldiyevich, who until that time had headed the State Concern “Turkmengas”, was appointed as the new Vice-Chairman for the fuel and energy complex of Turkmenistan.


161ea7f182c053.jpeg
Presidents of Turkmenistan and Uzbekistan discussed key issues of bilateral partnership by phone

Key issues of bilateral partnership were discussed by President of Turkmenistan Gurbanguly Berdimuhamedov and President of Uzbekistan Shavkat Mirziyoyev during a telephone conversation last Thursday, the State News Agency of Turkmenistan reports.


166706bcd6c54a.jpg
Labor successes of gas workers

Employees of the State Concern "Turkmengas" are making every effort to fulfill the tasks set by the head of state to increase the volume of natural gas production in the country. Of course, for domestic gas workers, this year, passing under the motto “The Fount of the Mind of Magtymguly Fragi,” like previous ones, will be marked by enormous labor successes.