Construction of the third oil loading terminal is underway in Turkmenbashi

16:35 17.05.2021 7357

https://oilgas.gov.tm/storage/posts/2203/original-160a212e980473.jpeg

 The third oil loading terminal is being built at the Kenar enterprise for the storage and shipment of oil products of the Turkmenbashi complex of oil refineries. Vice-Chairman Shahym Abdrakhmanov reported on the progress of its construction at the meeting of the Cabinet of Ministers, which President Gurbanguly Berdimuhamedov held last Friday in the city of Turkmenbashi.

 Having listened to the report, the President of Turkmenistan noted that in accordance with the «Program for the development of the oil and gas industry of Turkmenistan for the period up to 2030», a number of new technological units were planned to be built at the TCOR in the near future.

 In this regard, priority should be given to increasing the volume of crude oil supplies to the petrochemical complex, ensuring timely shipment of products manufactured by the largest oil refinery in the region to domestic and foreign consumers, the head of the state said and addressed a number of specific instructions to the Vice-Chairman.

 Currently, TCOR has two oil loading terminals for servicing oil tankers.

Other articles
16489bb6f8ae6b.jpg
Global demand for oil will grow until 2028, – IEA

The International Energy Agency (IEA) predicts in a June report that global oil demand will reach 105.7 million bpd in 2028, up 5.9 million bpd from 2022 levels.


1648b172a5cea8.jpg
Corporation “Turkmenenergo” will build solar power plants in remote areas of Turkmenistan

In remote settlements of Turkmenistan, the Turkmenenergo energy corporation plans to build solar power plants with a total capacity of more than 6 MW at the first stage. This was announced by the head of the service for the development of renewable energy sources “Turkmenenergo” Dovlet Allayarov at the International Scientific and Practical Conference: «Energy Prospects, New Technologies for the Development of Hydrocarbon Deposits”, which took place on Thursday in Ashgabat.


1648ab1e962f01.jpg
Pre-conference events were held at IUOG on the eve of the scientific forum

Two pre-conference events were held at the Yagshygeldi Kakaev International University of Oil and Gas (IUOG) on June 14 on the eve of the International Scientific and Practical Conference: «Energy Prospects, New Technologies for the Development of Hydrocarbon Deposits».


16489bde1bb8a0.jpg
Schoolchildren’s summer holiday season starts in Geokdere

The summer vacation season is currently in full swing in our country. Tired of the school bustle, the children plunged headlong into the atmosphere of joy, fun and new adventures that every day gives them, spent in one of the many children’s health centers in the picturesque corner of our country – the Geokdere Gorge.


16489938d99985.jpg
TS-1 aviation kerosene and oil bitumen were in demand at exchange trading

At the auction on Monday, June 12, 24 transactions were concluded for a total of $1 million and 150 million Turkmen manats, ORIENT reports.