High frontiers of Korpeje gas workers

15:47 31.12.2021 7648

https://oilgas.gov.tm/storage/posts/3658/original-161ce902dee151.jpeg

 Specialists of the Korpeje Gas Production Directorate of the «Nebitgazchykarysh» Trust of the State Concern «Turkmennebit» achieved high results in the production of natural gas in the highly productive gas fields of Turkmenistan in the past year.

 For 11 months, the production of «blue fuel» from the operating wells amounted to 2 billion 531 million cubic meters, while the plan was fulfilled by 165%.

 It should be noted that two-thirds of the total volume of natural gas produced by the concern over the past period falls on the share of Korpeje gas workers.  The employees of the department, which has been operating since 1998, manage to achieve high production indicators every year.  The department carries out production, preparation and delivery of natural gas to consumers from the operating wells of the Korpeje, Chekichli, Altyguyi fields.

 More than 750 specialists are currently employed here.  The equipment and computer systems used correspond to modern achievements of science, technology and technology, which helps to consistently achieve high production results and fully meet the needs for natural gas of the population and industrial facilities in the region.

 There is also an efficient troubleshooting service at Chekichler Square.  Here, on the operating unit for low-temperature gas separation, up to 5 million cubic meters of natural «blue fuel» are prepared daily.

 At the Akpatlavuk, Keymir and Chekichler squares, measuring instruments for the collection, preparation and delivery of gas to consumers, the power system and automation are effectively used.  More than forty productive wells are in operation at Korpeje, twenty-six at Chekichler, and five wells at the Altyguy field.  Since the beginning of the year, 11 wells have undergone major repairs, which in turn contributed to an increase in the production of «blue fuel».

 The gas obtained from the operating wells, after cleaning and full preparation, is sent to the oil and gas production departments “Gamyshlydzhanebit” and “Keymir” of the State Concern “Turkmennebit”, as well as to the Balkanabat enterprise “Gunbatargazakdyrysh” of the State Concern “Turkmengas”.

 The specialists of the department plan to complete as much work as possible by the end of this year so that the planned figure for natural gas production – 1.7 billion cubic meters – is doubled.

Other articles
166e0035199e37.jpg
The Turkmenistan Investment Forum TIF-2024 has started in Ashgabat

The Turkmenistan Investment Forum (TIF 2024) has started its work in the Yildiz Hotel in Ashgabat on September 10. It is intended to become an important international platform for attracting investments to the economy of our country.


164917f7d9c62d.png
At the auction, fuel and energy products were sold abroad and to the domestic market

45 transactions were registered at the auctions of the State Commodity and Raw Materials Exchange of Turkmenistan last week.


16200c5b14236e.jpeg
The leaders of Turkmenistan and China agreed to build a new gas pipeline to China

President of Turkmenistan Gurbanguly Berdimuhamedov held a meeting with President of the People's Republic of China Xi Jinping as part of his visit to Beijing last Saturday, the State News Agency of Turkmenistan reports.


16200db436210a.jpeg
Fuel oil and gasoline ECO-93 worth more than 52 million US dollars sold at the stock exchange of Turkmenistan

36 transactions were registered at the auctions of the State Commodity and Raw Materials Exchange of Turkmenistan over the past week.


1620115c6f2c9d.jpeg
Results of the work of fuel and energy enterprises in January were discussed

Reporting meeting was held in the Central building of the oil and gas complex of Turkmenistan on Monday. There the results of the work of industry enterprises for January 2022, held under the motto «Epoch of people with Arkadag», were discussed.